Breda Energia S.p.A.Germany
Giorgi Getsadze
Giorgi Getsadze
Proposted By Breda Energia S.p.A. Product

Horizontal Tree Wellhead


Main design features

  • Reduced wellhead height
  • Wellhead capability to accept both a "heavy" casing program or a "light" casing program
  • Large sized Tubing Hanger add flexibility to completion design
  • Tree installation/removal is not required for work over operations
  • Security/safety during work over operations is improved as handling of heavy tree is avoided. BOP installation and test operations are performed without separating the tree
  • Work over operational time is reduced
  • Wells gathered in clusters make positioning of drilling and work over rigs easier and quicker

  • Expand for more details
    Like
    Message
    Share
    Forward